CONA: ESTABLISHMENT OF THE OPTIMAL SYSTEM OF CONTAINING THE FIRST PRECIPITATION WAVE AND MINIMIZING SPILLED WASTEWATER INTO THE ROOT STREAM

News

 

The retention pool on Erjavčeva street is intended for the collection and pumping of wastewater from the entire agglomeration ID 1515 Kromberk. As part of the project, in accordance with the set tasks, we procured and installed new rakes, which serve to remove dirt from the sewer system. These separated particles represent an impermissible load on the treatment plant and therefore the system for collecting this dirt is very important. To improve the pumping process, two new pumps with complete process technology were installed.

 

The installed new equipment and applications will help to increase control and optimize and reduce energy consumption in the process of wastewater disposal in the city of Nova Gorica.